Jump to navigation
MS Projects in Engineering Management
2019
-
Ağlar M.A.,
and Karabacak T.,
A Multiple Criteria Decision Making Approach for Subcontractor Selection at ROKETSAN/ASELSAN,
supervised by Karasakal E.,
2019.
-
Kuş R.,
TÜPRAŞ Kırıkkale Refinery Hydrocracker Plant Multilinear Regression Analysis for Diesel T95 Predictor,
supervised by Karasakal E.,
2019.
-
Oral D.,
Comparison of Traditional, Stochastic and Fuzzy Logic PFMEA Approaches for Turkish Aerospace Composite Manufacturing Processes,
supervised by Tural M.K.,
2019.
-
Yüksel M.,
Demand Forecasting and Inventory Management of Kits at Türk Traktör Warehouse,
supervised by Meral S.,
2019.
2018
-
Aliyev O. ,
Optimization and Production Planning for Petrochemical Plants ,
supervised by Çelik M.,
2018.
-
Çelik E. A. ,
and Körpe B. E.,
Assembly Line Balancing at Aselsan’s Radio Factory in Saudi Arabia ,
supervised by Karasakal E.,
2018.
-
Cihan T. K. ,
Performance Measurement and Improvement of Processes Conducted in a Defense Industry Company ,
supervised by Çelik M.,
2018.
-
Kuş R. ,
TÜPRAŞ Kırıkkale Refinery Hydrocracker Plant Multilinear Regression Analysis for Diesel T95 Predictor ,
supervised by Karasakal E.,
2018.
-
Şahin Ö. C. ,
Tütün Ş. İ. Operation Center Response Management to Outages at Başkent EDAŞ Enerjisa ,
supervised by Karaer Ö.,
2018.
-
Şenfert N.,
and Yılmazsoy D. ,
Cost Optimization by Intershipment Method for Turkish Aerospace Industries,
supervised by Çelik M.,
2018.
-
Yüksel M.,
Demand Forecasting and Inventory Management of Kits at Türk Traktör ,
supervised by Meral S.,
2018.
2017
-
Algür B.,
and Atılgan D.,
Investment and Production Decision Support for Sodium Bicarbonate Production at Kazan Soda Elektrik Uretim A.S.,
supervised by Çelik M.,
2017.
-
Ateş E.D.,
and Hasançebi K.,
Data Driven Decision Support Tool (3DST) for Patent Application Process in Companies,
supervised by İyigün C.,
2017.
-
Aynacı Ü.H.,
and Baran T.C.,
Statistical Evaluation of Out-Of-Plane Bobbin Insert Failure Load Tests,
supervised by Serin Y.Y.,
2017.
-
Bardak B.,
Employee Turnover Analysis: Analytic Hierarchy Process and Machine Learning Approach,
supervised by Karasakal E.,
2017.
-
Başaran M.,
and Akyazı S.,
Electronic Unit Design and Prototyping Process Planning for ASELSAN A.Ş.,
supervised by Lokman B.,
2017.
-
Çalışkan A.K.,
and Özcan M.,
Site Selection for Wind-Solar Hybrid Power Plant in Turkey,
supervised by Bakal İ.S.,
2017.
-
Çolak M.A.,
Dealing with Uncertainities in Hydropower Energy Generation with Monte Carlo Methods,
supervised by Tural M.K.,
2017.
-
Duman H.A.,
and Karaca H.H.,
Supplier Selection Based on the Analytic Hierarchy Process and TOPSIS Methods,
supervised by Karasakal E.,
2017.
-
Gündüz Y.,
and Şenol A.S.,
Similarity Detections Between Phrases for Trademark Opposition Procedure,
supervised by Tural M.K.,
2017.
-
Karausta S.,
and Öztürk C.,
Planning a Warhead Prototype Assembly Project,
supervised by Kırca Ö.,
2017.
-
Otuzbiroğlu O.,
Planning for the Supplier Selection Considering Unit Component Prices in Türk Traktör,
supervised by Duran S.,
2017.
-
Şeker C.G.,
A Logistics Network Design Problem For a Spare Part System for TAI,
supervised by Bayındır Z.P.,
2017.
-
Sırmalı O.,
and Aydoğan A.,
Increasing of Right-First-Time Production Rate in a Manufacturing Unit at ROKETSAN,
supervised by Köksal G.,
2017.
-
Soydemir İ.,
and Peyiş A.,
Equipment Replacement and Operational Expenses Analyses for Tüpraş Kırıkkale Refinery Power Plant,
supervised by Meral S.,
2017.
-
Sümer H.S.,
Optimization of Requisition Distribution Over a Purchasing Team in Defense Industry Based on Monte Carlo Simulation,
supervised by Çelik M.,
2017.
-
Üstel D.,
Project Scheduling Under Risk Mitigation Considerations,
supervised by Çavdar B.,
2017.
-
Yıldırım H.O.,
Classification of Job Seekers via Data Mining,
supervised by İyigün C.,
2017.
2016
-
Aksoy E. ,
and Ünsal H.B.,
Water Resource Planning for Kazan Soda Elektrik Üretim A.Ş.,
supervised by Lokman B. ,
2016.
-
Alkan C.,
and Akdemir E.,
A Solar Energy System in Aselsan’s Akyurt Facility,
supervised by Bakal İ.S.,
2016.
-
Altunpıçak G.,
and Doğanay U.,
Cutting Stock Problem in Mitas Energy Inc.,
supervised by Bayındır Z.P,
2016.
-
Arslan C.,
Optic Selection by Using Multi-Criteria Decision Making Methods,
supervised by Karasakal E.,
2016.
-
Artaç A.,
and Dinç C.,
Simplifying the Price Regime of a Mechanical Part,
supervised by Duran S.,
2016.
-
Badur Ş.D.,
and Gündüz O.,
Tolerance Analysis of Axle Cradle of a Wheel Loader,
supervised by Köksal G.,
2016.
-
Başar Ü.D.,
Selecting Suitable Motor Type for Cogeneration Systems by Using Monte Carlo Simulation,
supervised by İyigün C.,
2016.
-
Başaran C.,
Supplier Selection Model for Mitas Energy,
supervised by Bayındır Z.P.,
2016.
-
Çakır A.M.,
Determining the Optimum Transport and Loading Type for the Evyap Export Countries,
supervised by Karaer Ö.,
2016.
-
Çeliker Z.E.,
Workforce Assignment Problem for Yenilik Common Health And Safety Company,
supervised by Lokman B.,
2016.
-
Geçkil B.,
Internal Auditor Assignment Project in Türk Traktör ve Ziraat Makineleri A.Ş.,
supervised by Serin Y. ,
2016.
-
Günay Çavdar B., ,
An Application of Traffic Engineering for MPLS Networking,
supervised by Tural M.K.,
2016.
-
Gürbüz A.,
and Kılıçarslan İ.,
Subcontractor Evaluation and Selection Application Using Multi Criteria Decision Making Techiniques,
supervised by İyigün C.,
2016.
-
Güzeler A.,
and Perçin U.,
A Resource Constrained Project Scheduling Problem with Subcontracting,
supervised by Çavdar B.,
2016.
-
Kekeç A.,
Predicting Bug Fixing Time in Aselsan Using K-Nearest Neighbor Algorithm and Augmented Value Difference Measure,
supervised by İyigün C.,
2016.
-
Kın B.,
Analysis and Improvement of Configuration Change Management Process at TAI,
supervised by Köksal G.,
2016.
-
Kırdar V.,
Bitcoin Currency Exchange Forecast,
supervised by Duran S.,
2016.
-
Önder O.,
and Özönder G.,
FNSS Warehouse Layout Desing and Storage Assignment,
supervised by Çelik M. ,
2016.
-
Öztürk O.,
Product Transfer Optimization Between Tupras Refineries,
supervised by Kırca Ö.,
2016.
-
Rahman T.,
Employee Assignment and Scheduling Problem for Safety First Using mTSP Approach,
supervised by Lokman B.,
2016.
-
Şenyurt E.B.,
and Bilgili N.,
Project Scheduling and Cost Analysis with Defined Resource Constraints in a Missile Project,
supervised by Sepil C.,
2016.
-
Tahancalio M.A.,
and Seymen V.S.,
Specific Rocket Motor Assembly Project Including Various Make-Buy Alternatives,
supervised by Gürel S.,
2016.
-
Tuncer C.B.,
Monte Carlo Simulation Applications in RF Calibrations,
supervised by Tural M.K.,
2016.
-
Türkili G.,
and Bozkurt S.,
Redesign of Warehousing Network,
supervised by Süral H.,
2016.
-
Uzunoğlu N.,
and Koltaş A.,
Optimization of Research Octane Number in Gasoline Pool by Minimizing the Cost of Gasoline Production,
supervised by Karasakal E.,
2016.
2015
-
Akın E.,
and Paksu B.,
Tüpraş Kırıkkale Refinery Determining Optimal Replacement Age for C-1652 and C-1653 Reactors,
supervised by Serin Y.,
2015.
-
Akyüz Mertoğlu H.,
Urban Furniture Market Analysis in Turkey and Strategic Planning for Mertoglu Environmental Design Co.,
supervised by Güven Ç.,
2015.
-
Aydede H.G.,
Spare Parts Inventory Management in Aselsan,
supervised by Bakal İ.S.,
2015.
-
Aydoğdu M.,
Reducing Defects of Reflow Soldering Process in Printed Circuit Board Assembly Line in ASELSAN,
supervised by Köksal G.,
2015.
-
Bilgehan K.,
Subcontractor Management at Aselsan,
supervised by Karaer Ö.,
2015.
-
Ekinciler K.,
Supplier Selection Process Design for Aselsan A.Ş.,
supervised by Karasakal E.,
2015.
-
Ercan B.,
Predicting Bug Fixing Time in Aselsan Using K-nearest Neighbor Algorithm and Attribute Weighted Value Difference Metric,
supervised by İyiGün C.,
2015.
-
Göçmez E.,
and Aghazadehkohnehshahr M.,
Establishment of Plasma Fractionation Plants in Turkey,
supervised by Meral S.,
2015.
-
İnal Ç.,
Medium Term Electricity Demand Forecasting For City of Ankara,
supervised by İyigün C.,
2015.
-
İnan M. İ.,
Defect Analysis and Quality Improvement at Karel,
supervised by Köksal G.,
2015.
-
Kamalı K. ,
and Mehmetlioğlu B.,
Make or Buy Decision for Rocket Motor Production,
supervised by Duran S.,
2015.
-
Karaca A. M.,
and Koca Z. Ö.,
Base Station Location Planning for Turkcell,
supervised by Lokman B.,
2015.
-
Karaman G.,
and Kurşun T:,
Using Monte Carlo Simulation for Tolerance Determination,
supervised by Tural M. K.,
2015.
-
Kul S.,
Spare Parts Inventory Management for Baskent Electricity Distribution Company (Başkent EDAŞ),
supervised by Bakal İ.S.,
2015.
-
Nahırcıoğlu M.T.,
and Can U.D.,
Resource Constrained Project Scheduling Problem-Comparison of Two Models on a Real Life Project,
supervised by Sepil C.,
2015.
-
Tümer C.,
Assigning New Tractor Distributor For New Holland at Middle East & Africa Region,
supervised by Lokman B.,
2015.
-
Uzun B.,
Statistical Analysis of Stock Market Prices of Turk Traktor A.Ş.,
supervised by Duran S.,
2015.
-
Yağlı B.,
Kırıkkale Refinery Filling Stations Upgrading & Optimizations by Using Monte Carlo Simulation,
supervised by Tural M. K.,
2015.
2014
-
Adiyan D.,
Creating and Conducting Life Cycle Cost Analysis in Newly-Developed Systems,
supervised by Tural M.K.,
2014.
-
Akalın Aksoy G,
and Aksoy D.,
Meta-Gördes Nickel Cobalt Plant Master Schedule & Contracting Strategy,
supervised by Karasakal E.,
2014.
-
Akıllıoğlu Z.,
Assembly Line Design and Balancing,
supervised by Kırca Ö.,
2014.
-
Akkök S.,
and Doğanyiğit E.,
Sales Team Task Assignment Problem,
supervised by Gürel S.,
2014.
-
Aktaş N.,
Initial Investment of Emek R&D Office and Its Project Planning,
supervised by Karaer Ö.,
2014.
-
Atak N.,
Supplier Performance Measurement and Procurement Decision Support System for ETİ Gıda A.Ş.,
supervised by Meral S.,
2014.
-
Başıbüyük K.,
and Sarıgöz Ç.,
Customer Comment Scoring for a Website Using Text Mining,
supervised by İyigün C.,
2014.
-
Bulut B.,
Comparing Earned Value Analysis and Earned Schedule Approach: A Case Study in Milsoft,
supervised by Gürel S.,
2014.
-
Çelik B.,
A Planning Methodology for a PAMR (Public Access Mobile Radio) Operator,
supervised by Güven Ç.,
2014.
-
Çelik K.,
and Dindaş D.,
A Resource Constrained Project Scheduling Problem in Roketsan,
supervised by Azizoğlu M.,
2014.
-
Coşkun E.,
Development of a Strategy in The International Market for Aselsan’s System X,
supervised by Karaer Ö,
2014.
-
Dağdeviren S.,
Planning Material Shipments and Inventory Control in Arçelik A.Ş. Dishwasher Plant,
supervised by Süral H.,
2014.
-
Dağüstün B.,
and Bağdatoğlu D.,
Spare Part Optimization Using Monte Carlo Simulation,
supervised by Tural M. K.,
2014.
-
Demircan E.,
A Critical and Improving Approach on Clinical Research Projects Conducted by Pharmaceutical Company Astrazeneca,
supervised by Karaer Ö.,
2014.
-
Er B.,
A Decision Support Tool for Farm-out Bidding in Mediterranean and Black Sea Regions for the Turkish Petroleum (TP),
supervised by Meral S.,
2014.
-
Görkey Turgut Ç.,
and Eser O.,
Selection of Bariatric Surgery Methods Using AHP,
supervised by Duran S.,
2014.
-
İlhan C.,
Concrete Reinforcing Steel Cutting Patterns Setting and Packing Using Integer Programming,
supervised by Süral H.,
2014.
-
Kahraman G.Ö.,
Statistical Analysis of Selected Companies’ Stocks,
supervised by Duran S.,
2014.
-
Kayabalı D.,
Economic Analysis of Alternative Armor Systems in Establishing a Flow Shop,
supervised by Meral S.,
2014.
-
Koç Karakaş E.,
Proposal of an Efficient Problem Addressing Methodology Based on Situational Analysis and Analysis of Past Data,
supervised by İyigün C.,
2014.
-
Latifoğlu B.,
and Gülpınar H.,
Cost and Time Analysis Report on Adding New Battery Management Feature to RCWs,
supervised by Tural M. K.,
2014.
-
Orhan N.M.,
Office Layout Optimization,
supervised by Karasakal E.,
2014.
-
Özel A.A.,
and Paydak S.E.,
Wind Power Site Selection in Turkey,
supervised by Bakal İ.S.,
2014.
-
Öztürk S.,
Consideration of Design Parameters Effecting Life Cycle Costs in Selecting Best Alternative Unit,
supervised by Duran S.,
2014.
-
Parlatan M.,
and Örnek O.C.,
A Decision Tool for Short Term Portfolio Strategy Making with Foreign Currencies,
supervised by Süral H., İyigün C.,
2014.
-
Sakin G.,
and Tarhan M.,
Forecasting and Assignment of Workload in Technical Department of MAN Türkiye A.Ş.,
supervised by Tural M.K.,
2014.
-
Saralp C.,
Vendor Selection of Gama Power Systems,
supervised by Bayındır Z.P.,
2014.
2012
-
Abay S.,
Step by Step Approach to Organization Design of Meka Concrete Batching Plants,
supervised by İyigün C.,
2012.
-
Altunay D.,
Optimum Capital Structure Analysis for Oyak Group Cement Sector Companies,
supervised by Duran S.,
2012.
-
Arslan A.,
and Biçici B.E.,
Coal Fired Power Plant Economic Analysis,
supervised by Meral S.,
2012.
-
Atalay A.,
A Business Plan for Bilimsel Teknik Ltd. in Plain Bearing Market,
supervised by Duran S.,
2012.
-
Aykurt C.,
and Parlatan M.F.,
Procurement Type Analysis for Tank Fire Control System,
supervised by Gürel S.,
2012.
-
Baybaş M.,
Work Schedule, Resource and Cost Analysis for Mechanical Works of Aselsan Gölbaşı Plant Construction Project,
supervised by Sepil C.,
2012.
-
Çakıroğulları S.,
and Barış G.,
Toyota Production System and Viability Assessment in Roketsan,
supervised by İyigün C.,
2012.
-
Ceylan Karabörk N.,
and Tuna B.Z.,
Development and Implementation of a Scheduling Algorithm for Single-Source Multi-Tasking Real-Time Systems,
supervised by Gürel S.,
2012.
-
Çiftçi Y.,
Solving a Satellite Camera Scheduling Problem with the Use of Time-Indexed Formulation,
supervised by Gürel S.,
2012.
-
Dinçer M.,
Document Recommendation System for Turkish Aerospace Industries, Inc.,
supervised by İyigün C.,
2012.
-
Gencosmanoğlu Y.,
Crashing Analysis and Evaluation of Alternative Solutions to High Voltage Current Transformers Manufacturing Process,
supervised by Meral S.,
2012.
-
Göktürk İ.G.,
Capital Budgeting Problem in the Investment of Solar Projects,
supervised by Meral S.,
2012.
-
Kaplan T.,
Rearrangement of Existing Layout of Pi Makina Factory Machining Division,
supervised by Kırca Ö.,
2012.
-
Karahan E.,
A Decision Support System for Construction Exploration of Renovation Projects,
supervised by Bayındır Z.P.,
2012.
-
Kazaklı A.E.,
and Karademir F.,
Software FMEA for Quality Improvement in Turkish Aerospace Industries,
supervised by Köksal G.,
2012.
-
Kulaksız T.,
An Approach for Improving the Efficiency of the Dunning Process for Enerjisa,
supervised by Meral S.,
2012.
-
Onur S.O.,
Improvement of a Motor Driving Circuit Design for Better Quality at Low Cost,
supervised by Köksal G.,
2012.
-
Özgiresun C.,
Forecasting Electricity Demand in Turkey on Monthly Basis,
supervised by İyigün C.,
2012.
-
Özvarlık Z.C.,
An Investigation of Learning in a Chemical Company,
supervised by Durgut M.,
2012.
-
Seçgin A.,
Minimizing the Cost of Natural Gas Transportation in Turkey between 2013 - 2015,
supervised by Duran S.,
2012.
-
Sevinç A.S.,
A Method for Reducing the Health and Safety Risks Exposed to Labor in a Manufacturing Plant,
supervised by Gürel S.,
2012.
-
Sezgin A.H.,
and Kuşakoğlu O.,
Feasibility Report of a Modern Fruit Orchard,
supervised by Sepil C.,
2012.
-
Ufuk H.,
and Kacı M.,
Review of The Agile and PMI Concepts in Project Management and Designing the Basic Features of the Agile Project Management Soft,
supervised by Sepil C.,
2012.
2011
-
Akbatur N.M.,
Strategic Positioning of a Pharmaceutical Company,
supervised by Sayın E.,
2011.
-
Akça M.,
Overlapping Project Scheduling with Discounted Cash Flows,
supervised by Sepil C.,
2011.
-
Aksoy A.E.,
and Boylu S.,
A Supplier Selection Method for the Printed Circuit Board Manufacturers,,
supervised by Meral S.,
2011.
-
Aydın B.,
Implementations of Enterprise Resource Planning Systems in Small and Medium-Sized Enterprises in Turkey,
supervised by Gürel S.,
2011.
-
Bal E.,
and Akça M.,
Kırıkkale Refinery Steam and Boiler Fuel Optimization,
supervised by Bakal İ.S.,
2011.
-
Bebek A.,
Valuation of Tüpraş Refineries Corp. by Discounted Cash Flow Method,
supervised by Oran A.,
2011.
-
Canan P.,
Labor Hour Standardization of Hand Lay-up Process in Composite,
supervised by Sepil C.,
2011.
-
Çay P.,
and Güngör N.A.,
Method for Deciding the Aircraft Type Certificate Application Date,
supervised by Azizoğlu M.,
2011.
-
Çengen O.S.,
and Türker N.,
Assembly Line Balancing Study at FNSS: AAB Vehicle,
supervised by Kırca Ö.,
2011.
-
Çiftçi E.,
and Dalmış M.,
Optimizing Agriculture Activities in Kahramanmaraş Area,
supervised by Duran S.,
2011.
-
Duru U.,
İnlice Gold Mine Feasibility Study,
supervised by Kırca Ö.,
2011.
-
Erdoğan Ü.E.,
and Kaplan K.,
System Development in Quality Functions of Türk Traktör with WCM,
supervised by Gürel S.,
2011.
-
Görgülü G.,
and Pektaş B.,
An Application of Multi-Mode Resource Constrained Software Project Scheduling,
supervised by Sepil C.,
2011.
-
Hüyük T.,
Establishment of Contract Policy with Systematic Payment Schedule,
supervised by İyigün C.,
2011.
-
İpekçi K.B.,
and Çatal Z.S.,
A Production Planning Study for 24 Yemek Yönetimi Ltd. Şti. with the Aid of a Simulation Program,
supervised by İyigün C.,
2011.
-
İşevcan M.,
Reliability-Centered Maintenance Approach for the Production Facilities in an Aerospace Company,
supervised by Meral S.,
2011.
-
Kamberli E.,
and Kamberli Ö.,
Yearly Maintenance Routing for Medelsis Company,
supervised by Kırca Ö.,
2011.
-
Karaca E.,
Rough Cut Capacity Planning in Catering Sector,,
supervised by Gürel S.,
2011.
-
Karaca M.,
and Eken C.,
Vendor Selection Process at FNSS,
supervised by Karasakal E.,
2011.
-
Karaçay A.,
and Özmen V.K.,
Procurement of Nozzle Housings in the Rocket Company,
supervised by Meral S.,
2011.
-
Karademir F.,
and Kazaklı A.E.,
Software FMEA for Quality Improvement in Turkish Aerospace Industries, Inc.,
supervised by Köksal G.,
2011.
-
Kayabaşı T.,
Absorptive Capacity,
supervised by Sayın E.,
2011.
-
Nalbant B.,
A Decision Support System for Determining the Level of Automation for an Automotive Company,
supervised by Meral S.,
2011.
-
Önal A.E.,
and Kızılöz M.İ.,
A Business Process Reengineering Project: Toyan Automotive Industry and Trade Co.,
supervised by Gürel S.,
2011.
-
Özer B.G.,
and Aydoğan M.,
Technology Learning in a High Tech Company: A New Product Development Perspective,
supervised by Durgut M.,
2011.
-
Öztürk O.,
Production Planning in Ünye Cement Plant,
supervised by Azizoğlu M.,
2011.
-
Şahin D.,
Assignment Problem of Industrial R&D Projects to Evaluators,
supervised by Azizoğlu M.,
2011.
-
Saraçoğlu D.,
Comparison of CMMI Dev and ISO Standards wrt Software Development Processes and Application in SIEMENS,
supervised by Çilingir C.,
2011.
-
Sarıcanbaz E.,
Efficiency Evaluation and Performance Improvement Using Integer Programming Approach for Tender Department of Zafer Contracting ,
supervised by İyigün C.,
2011.
-
Şener Ö.,
and Talu K.,
Reengineering the Inventory Management System and the Process of Procurement in TÜPRAŞ Co.,
supervised by Sayın E.,
2011.
-
Ülker Ö.,
Determining Optimum Project Schedules in Multi-Project Environments,
supervised by Duran S.,
2011.
-
Varışlı F.,
and Öztürk A.C.,
Re-Transmission Unit Replacement Project,
supervised by Meral S.,
2011.
-
Zilan K.,
and Doğan T.,
Stock Market Analysis Using Clustering,
supervised by İyigün C.,
2011.
-
Alperten M.,
Detailed International Business Plan for a Foundry,
supervised by Çelik M.,